PRICES include / exclude VAT
Homepage>ANSI/IEEE 484-1975 - IEEE Recommended Practice for Installation Design and Installation of Large Lead Storage Batteries for Generating Stations and Substations
Sponsored link
Released: 27.01.1975

ANSI/IEEE 484-1975 - IEEE Recommended Practice for Installation Design and Installation of Large Lead Storage Batteries for Generating Stations and Substations

IEEE Recommended Practice for Installation Design and Installation of Large Lead Storage Batteries for Generating Stations and Substations

Format
Availability
Price and currency
English PDF
Immediate download
56.67 EUR
Standard number:ANSI/IEEE 484-1975
Released:27.01.1975
ISBN:978-1-5044-0363-4
Pages:12
Status:Active
Language:English
DESCRIPTION

ANSI/IEEE 484-1975

This document provides recommended design practices and procedures for storage, location, mounting, ventilation, instrumentation, preassembly, and assembly of large lead sealed cell storage batteries. Required safety practices are also included. This document applies particularly to installations at generating stations (including nuclear) and large substations. The portions of this document that will specifically relate to personnel and nuclear plant safety are mandatory and are designated by the word shall; all other portions are recommended practices and are designated by the word should. Battery sizing, maintenance, capacity testing, charging equipment, and consideration of other types of batteries are beyond the scope of this document



New IEEE Standard - Superseded. Proper installation design and installation procedures are prerequisite to long and reliable service of large stationary lead storage batteries. A definite need exists within the industry for recommendations that provide a uniform method for the design of the installation and the installation procedures of all batteries to meet station requirements. However, to provide practices that can be used immediately (especially for nuclear power generating stations), this document will limit its scope to the installation design and installation procedures of large stationary lead storage batteries. Included will be the seismic considerations for new battery installations.