PRICES include / exclude VAT
Homepage>ASTM Standards>23>23.040>23.040.01>ASTM F2536-17R22 - Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs
Sponsored link
Released: 01.02.2022

ASTM F2536-17R22 - Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs

Standard Guide for Installing Plastic DWV Piping Suspended from On-Grade Slabs

Format
Availability
Price and currency
English PDF
Immediate download
52.97 EUR
English Hardcopy
In stock
52.97 EUR
Standard number:ASTM F2536-17R22
Released:01.02.2022
Status:Active
Pages:3
Section:08.04
Keywords:hangers; suspended DWV; underslab;
DESCRIPTION

1.1 This guide provides procedures for the installation of DWV piping in buildings that are built where soil conditions require the use of pier or piling supported grade beam construction or in filled ground where the soil compaction is less than 95 %. These procedures are intended to ensure that the DWV piping suspended from the on grade concrete slabs is not damaged or destroyed by movement of the soil or fill under the slab after the building is completed and occupied.

1.2 In this type of construction, the area within the grade beams is filled with soil up to a level that allows the concrete slab to be poured directly on the fill without a supporting form. In this process the sanitary waste piping is installed by trenching into the fill, and then putting hangers with support rods on the pipes as they are installed. The hanger rods extending upward must be long enough so that the top of the rod will be embedded in and anchored in the concrete.

1.3 The hanger rods are intended to provide adequate strength and corrosion resistance to assure long term service.

1.4 The details of installation are intended to ensure that the rods remain vertical, that they extend into the concrete an adequate amount and that the upper ends are terminated so that they have adequate “pull out” strength.

1.5 The details of backfill are intended to limit or minimize the loads on the a suspended piping. These loads result from consolidation or movement of the soil/fill beneath the slab.

1.6 The values stated in inch-pound units are to be regarded as standard. No other units of measurement are included in this standard.

1.7 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.8 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.