PRICES include / exclude VAT
Homepage>ASTM Standards>ASTM F3714-25 - Additive manufacturing of metals — Qualification principles  — Installation, operation and performance (IQ/OQ/PQ) of PBF-EB equipment
Sponsored link
Released: 15.01.2025

ASTM F3714-25 - Additive manufacturing of metals — Qualification principles  — Installation, operation and performance (IQ/OQ/PQ) of PBF-EB equipment

Additive manufacturing of metals — Qualification principles  — Installation, operation and performance (IQ/OQ/PQ) of PBF-EB equipment

Format
Availability
Price and currency
English PDF
Immediate download
58.74 EUR
English Hardcopy
In stock
58.74 EUR
Standard number:ASTM F3714-25
Released:15.01.2025
Status:Active
Pages:4
Section:10.04
DESCRIPTION

1.1 This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document.

1.2 This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal.

1.3 Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.

1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.