PRICES include / exclude VAT
Sponsored link
immediate downloadReleased: 2021-08-11
BS EN 16907-7:2021 Earthworks Hydraulic placement of extractive waste

BS EN 16907-7:2021

Earthworks Hydraulic placement of extractive waste

Format
Availability
Price and currency
English Secure PDF
Immediate download
376.80 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
37.68 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
113.04 EUR
English Hardcopy
In stock
376.80 EUR
Standard number:BS EN 16907-7:2021
Pages:102
Released:2021-08-11
ISBN:978 0 539 01304 7
Status:Standard
BS EN 16907-7:2021 Earthworks Hydraulic placement of extractive waste

BS EN 16907-7:2021 Earthworks Hydraulic Placement of Extractive Waste

Standard Number: BS EN 16907-7:2021

Pages: 102

Released: 2021-08-11

ISBN: 978 0 539 01304 7

Name: Earthworks Hydraulic Placement of Extractive Waste

Status: Standard

Overview

The BS EN 16907-7:2021 standard is an essential document for professionals involved in earthworks and the hydraulic placement of extractive waste. Released on August 11, 2021, this comprehensive 102-page standard provides detailed guidelines and best practices to ensure the safe and efficient management of extractive waste through hydraulic placement methods.

Why Choose BS EN 16907-7:2021?

This standard is a must-have for engineers, project managers, and environmental consultants who are responsible for the planning, design, and execution of earthworks projects. The guidelines outlined in this document are designed to help you achieve optimal results while adhering to the highest safety and environmental standards.

Key Features

  • Comprehensive Coverage: With 102 pages of in-depth information, this standard covers all aspects of hydraulic placement of extractive waste, from initial planning to final execution.
  • Up-to-Date Information: Released in 2021, this standard reflects the latest industry practices and technological advancements.
  • Environmental Compliance: Ensure your projects meet stringent environmental regulations and minimize their impact on the surrounding ecosystem.
  • Safety Guidelines: Prioritize the safety of your team and the public by following the detailed safety protocols outlined in this standard.
  • ISBN: Easily reference and cite this standard with its unique ISBN: 978 0 539 01304 7.

Who Should Use This Standard?

The BS EN 16907-7:2021 standard is designed for a wide range of professionals, including:

  • Engineers: Gain a thorough understanding of the best practices for hydraulic placement of extractive waste.
  • Project Managers: Ensure your projects are completed on time, within budget, and in compliance with industry standards.
  • Environmental Consultants: Provide expert advice on minimizing the environmental impact of earthworks projects.
  • Regulatory Authorities: Verify that projects adhere to the latest safety and environmental regulations.

Benefits of Using BS EN 16907-7:2021

Implementing the guidelines and best practices outlined in this standard can provide numerous benefits, including:

  • Improved Efficiency: Streamline your earthworks projects with clear, concise guidelines that help you avoid common pitfalls and delays.
  • Enhanced Safety: Protect your team and the public by adhering to the rigorous safety protocols outlined in this standard.
  • Environmental Protection: Minimize the environmental impact of your projects by following best practices for waste management and disposal.
  • Regulatory Compliance: Ensure your projects meet all relevant safety and environmental regulations, reducing the risk of fines and legal issues.
  • Professional Credibility: Demonstrate your commitment to industry standards and best practices, enhancing your professional reputation and credibility.

Table of Contents

The BS EN 16907-7:2021 standard is organized into several key sections, each covering a specific aspect of hydraulic placement of extractive waste. While the full table of contents is available within the document, some of the main sections include:

  • Introduction: An overview of the standard and its objectives.
  • Scope: A detailed description of the standard's coverage and limitations.
  • Definitions: Key terms and definitions used throughout the document.
  • Planning and Design: Guidelines for the initial planning and design of hydraulic placement projects.
  • Execution: Best practices for the safe and efficient execution of hydraulic placement projects.
  • Monitoring and Maintenance: Procedures for ongoing monitoring and maintenance to ensure long-term project success.
  • Environmental Considerations: Strategies for minimizing the environmental impact of hydraulic placement projects.
  • Safety Protocols: Detailed safety guidelines to protect workers and the public.

Conclusion

The BS EN 16907-7:2021 standard is an invaluable resource for anyone involved in earthworks and the hydraulic placement of extractive waste. With its comprehensive coverage, up-to-date information, and focus on safety and environmental compliance, this standard provides the guidance you need to ensure the success of your projects. Whether you are an engineer, project manager, environmental consultant, or regulatory authority, this standard will help you achieve optimal results while adhering to the highest industry standards.

DESCRIPTION

BS EN 16907-7:2021


This standard BS EN 16907-7:2021 Earthworks is classified in these ICS categories:
  • 93.020 Earthworks. Excavations. Foundation construction. Underground works
This European Standard gives general guidelines for the hydraulic placement of extractive wastes applicable, in particular, to the extractive industries. The scope of this European Standard includes any dam, confining embankment or other structure serving to contain, retain, confine or otherwise support such wastes on surface in a terrestrial environment. This standard therefore addresses the characterisation of the extractive waste for the purposes of hydraulic placement in the MWF both as part of the confining embankment and for safe storage, and in addition: - specifies minimum requirements for the data to be acquired before the design and execution stage of a hydraulic fill project; - provides guidelines for the selection of the type of confining embankment appropriate for the selected site; - provides guidelines for the selection and characterisation of the construction materials; - establishes general principles on how to design and execute the hydraulic fill project from pre deposition through operation to closure and rehabilitation; - provides guidelines for monitoring and quality control of all stages of the hydraulic fill project to ensure long-term safety and stability.