PRICES include / exclude VAT
Homepage>BS Standards>33 TELECOMMUNICATIONS. AUDIO AND VIDEO ENGINEERING>33.200 Telecontrol. Telemetering>BS EN 60870-6-503:2014 Telecontrol equipment and systems Telecontrol protocols compatible with ISO standards and ITU-T recommendations. TASE.2 Services and protocol
Sponsored link
immediate downloadReleased: 2014-10-31
BS EN 60870-6-503:2014 Telecontrol equipment and systems Telecontrol protocols compatible with ISO standards and ITU-T recommendations. TASE.2 Services and protocol

BS EN 60870-6-503:2014

Telecontrol equipment and systems Telecontrol protocols compatible with ISO standards and ITU-T recommendations. TASE.2 Services and protocol

Format
Availability
Price and currency
English Secure PDF
Immediate download
399.30 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
39.93 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
119.79 EUR
English Hardcopy
In stock
399.30 EUR
Standard number:BS EN 60870-6-503:2014
Pages:156
Released:2014-10-31
ISBN:978 0 580 78271 8
Status:Standard
DESCRIPTION

BS EN 60870-6-503:2014


This standard BS EN 60870-6-503:2014 Telecontrol equipment and systems is classified in these ICS categories:
  • 33.200 Telecontrol. Telemetering
IEC 60870-6-503:2014 specifies a method of exchanging time-critical control centre data through wide-area and local-area networks using a full ISO compliant protocol stack. It contains provisions for supporting both centralized and distributed architectures. This standard includes the exchange of real-time data indications, control operations, time-series data, scheduling and accounting information, remote program control and event notification. This new edition includes the following significant technical changes with respect to the previous edition:
- certain objects were made informative;
- services associated with the informative objects were made informative;
- certain TASE.2 conformance blocks were made out-of-scope.