PRICES include / exclude VAT
Homepage>BS Standards>45 RAILWAY ENGINEERING>45.060 Railway rolling stock>45.060.01 Railway rolling stock in general>BS EN 61375-1:2012 Electronic railway equipment. Train communication network (TCN) General architecture
Sponsored link
immediate downloadReleased: 2012-08-31
BS EN 61375-1:2012 Electronic railway equipment. Train communication network (TCN) General architecture

BS EN 61375-1:2012

Electronic railway equipment. Train communication network (TCN) General architecture

Format
Availability
Price and currency
English Secure PDF
Immediate download
370.26 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
37.03 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
111.08 EUR
English Hardcopy
In stock
370.26 EUR
Standard number:BS EN 61375-1:2012
Pages:54
Released:2012-08-31
ISBN:978 0 580 68226 1
Status:Standard
DESCRIPTION

BS EN 61375-1:2012


This standard BS EN 61375-1:2012 Electronic railway equipment. Train communication network (TCN) is classified in these ICS categories:
  • 45.060.01 Railway rolling stock in general

This part of IEC 61375 applies to the architecture of data communication systems in open trains, i.e. it covers the architecture of a communication system for the data communication between vehicles of the said open trains, the data communication within the vehicles and the data communication from train to the ground.

The applicability of this part of IEC 61375 to the train network technologies allows for interoperability of individual vehicles within open trains in international traffic. The data communication systems inside vehicles are given as recommended solutions to cope with the said TCN. In any case, proof of compatibility between a proposed train backbone and a proposed consist network will have to be brought by the supplier.

This part of IEC 61375 may be additionally applicable to closed trains and multiple unit trains when so agreed between purchaser and supplier.

NOTE 1 For a definition of open trains, multiple unit trains and closed trains, see Clause 3.

NOTE 2 Road vehicles such as buses and trolley buses are not considered in this part of IEC 61375.