PRICES include / exclude VAT
Sponsored link
immediate downloadReleased: 2015-01-31
BS EN 62670-1:2014
Photovoltaic concentrators (CPV). Performance testing Standard conditions
Format
Availability
Price and currency
English Secure PDF
Immediate download
162.14 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standardfor 1 hour
16.21 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standardfor 24 hours
48.64 EUR
English Hardcopy
In stock
162.14 EUR
Standard number: | BS EN 62670-1:2014 |
Pages: | 10 |
Released: | 2015-01-31 |
ISBN: | 978 0 580 74539 3 |
Status: | Standard |
DESCRIPTION
BS EN 62670-1:2014
This standard BS EN 62670-1:2014 Photovoltaic concentrators (CPV). Performance testing is classified in these ICS categories:
- 27.160 Solar energy engineering
This part of IEC 62670 defines standard conditions for assessing the power produced by CPV systems and their photovoltaic subcomponents. The object of this part of IEC 62670 is to define a consistent set of conditions so that power ratings noted on data sheets and nameplates will have a standard basis. Two sets of conditions are included to characterize:
operating conditions that represent on-sun performance relative to commonly measured meteorological conditions, and
test conditions that represent performance when the module is in a readily reproducible environment.