PRICES include / exclude VAT
Homepage>BS Standards>03 SOCIOLOGY. SERVICES. COMPANY ORGANIZATION AND MANAGEMENT. ADMINISTRATION. TRANSPORT>03.120 Quality>03.120.01 Quality in general>BS IEC 60300-3-7:1999 Dependability management. Application guide Application guide. Reliability stress screening of electronic hardware
Sponsored link
immediate downloadReleased: 1999-09-15
BS IEC 60300-3-7:1999 Dependability management. Application guide Application guide. Reliability stress screening of electronic hardware

BS IEC 60300-3-7:1999

Dependability management. Application guide Application guide. Reliability stress screening of electronic hardware

Format
Availability
Price and currency
English Secure PDF
Immediate download
312.18 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
31.22 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
93.65 EUR
English Hardcopy
In stock
312.18 EUR
Standard number:BS IEC 60300-3-7:1999
Pages:38
Released:1999-09-15
ISBN:0 580 32937 2
Status:Standard
DESCRIPTION

BS IEC 60300-3-7:1999


This standard BS IEC 60300-3-7:1999 Dependability management. Application guide is classified in these ICS categories:
  • 31.020 Electronic components in general
  • 03.120.01 Quality in general

This part of IEC 60300 serves as an application guide to a reliability stress screening process for electronic hardware. The concept, purpose and justification of the screening process are explained. The main elements of a screening programme are stated, together with the general planning procedure. This standard is intended as a guide and should be used in conjunction with one of the IEC reliability stress screening standards, ("tools" in the toolbox concept), referenced in clause 15, based on the screening process application level.

This standard gives guidance in cases where it is essential that early failures be removed from the items manufactured in order to deliver them to the customer when the problems causing the early failures are solved. The standard also gives guidance on where the reliability stress screening should be carried out, i.e. component level, subsystem level, or system level (see figure 1), and can also be used where steps to reduce the risk of early failures are included in a contract.

This standard is aimed at personnel in the contract department, project management, product development, process management, production, quality control and purchasing.