PRICES include / exclude VAT
Homepage>CSN Standards>33 ELECTRICAL ENGINEERING ELECTROTECHNICAL REGULATIONS>3331 Electric power generating plants>CSN EN IEC 61400-21-2 - Wind energy generation systems - Part 21-2: Measurement and assessment of electrical characteristics - Wind power plants
Sponsored link
Released: 01.10.2023
CSN EN IEC 61400-21-2 - Wind energy generation systems - Part 21-2: Measurement and assessment of electrical characteristics - Wind power plants

CSN EN IEC 61400-21-2

Wind energy generation systems - Part 21-2: Measurement and assessment of electrical characteristics - Wind power plants

Format
Availability
Price and currency
English Hardcopy
In stock
140.00 EUR
FREE Shipping
Number of Standard:CSN EN IEC 61400-21-2
Category:333160
Pages:156
Released:01.10.2023
Catalog number:517590
DESCRIPTION

CSN EN IEC 61400-21-2

CSN EN IEC 61400-21-2 This part of IEC 61400 defines and specifies the quantities that are determined to characterize the electrical characteristics of grid-connected power plants (PPs). This document defines the measurement and test procedures for quantifying the electrical characteristics as basis for the verification of compliance of PPs, including: - power quality aspects, - steady state operation, - dynamic response (undervoltage and overvoltage fault ride-through), - disconnection from grid (grid protection), - control performance. This document defines a uniform functionality test and measurement procedure for the power plant controller (PPC), as a basis for the unit test of the power plant controller. This document defines the procedures for assessing compliance with electrical connection requirements, including the aggregation methods for power quality aspects such as voltage variations, flicker, harmonics and interharmonics. This document defines the procedures for measurement and fault recording, for example for the verification of power plant electrical simulation models in relation to undervoltage and overvoltage ride-through events. These measurement procedures are valid for power plants, including the power plant controller and other connected equipment, necessary for the operation of the power plant. The measurement procedures are valid for any size of power plant connected to the point of connection (POC) at one connection point. The procedures for assessing and verifying the compliance with grid connection requirements are valid for power plants in power systems with fixed frequency and a sufficient short-circuit power.
Original English text of CSN EN Standard.
The price of the Standard included all amendments and correcturs.