PRICES include / exclude VAT
Homepage>BS Standards>23 FLUID SYSTEMS AND COMPONENTS FOR GENERAL USE>23.080 Pumps>DD CLC/TS 50537-2:2010 Railway applications. Mounted parts of the traction transformer and cooling system Pump for insulating liquid for traction transformers and reactors
Sponsored link
immediate downloadReleased: 2010-07-31
DD CLC/TS 50537-2:2010 Railway applications. Mounted parts of the traction transformer and cooling system Pump for insulating liquid for traction transformers and reactors

DD CLC/TS 50537-2:2010

Railway applications. Mounted parts of the traction transformer and cooling system Pump for insulating liquid for traction transformers and reactors

Format
Availability
Price and currency
English Secure PDF
Immediate download
312.18 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
31.22 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
93.65 EUR
English Hardcopy
In stock
312.18 EUR
Standard number:DD CLC/TS 50537-2:2010
Pages:34
Released:2010-07-31
ISBN:978 0 580 69507 0
Status:Standard
DESCRIPTION

DD CLC/TS 50537-2:2010


This standard DD CLC/TS 50537-2:2010 Railway applications. Mounted parts of the traction transformer and cooling system is classified in these ICS categories:
  • 29.180 Transformers. Reactors
  • 23.080 Pumps
  • 45.060.10 Tractive stock

This Technical Specification covers requirements for electric pumps which generate the circulation of insulation liquid in traction transformers and reactors of rail vehicles and their associated cooling system.

The pumps covered by this Technical Specification are rotodynamic pumps driven by a squirrel cage induction motor which is immersed in the insulating liquid.

CLC/TS 50537-2 gives consideration to both technical and normative requirements of the railway environment and restricts the variety provided by industry-wide standards for pumps (for example EN 50216-7 and EN ISO 9906). It determines requirements and tests enabling the interchangeability especially regarding electrical, mechanical and hydraulic interfaces. Furthermore, service conditions are described.