PRICES include / exclude VAT
Homepage>IEC Standards>IEC 60965:2016 - Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room
Sponsored link
download between 0-24 hoursReleased: 2016-02-23
IEC 60965:2016 - Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room

IEC 60965:2016

Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room

Centrales nucléaires de puissance - Salles de commande - Salle de commande supplémentaire pour l'arrêt des réacteurs sans accès à la salle de commande principale

Format
Availability
Price and currency
English/French - Bilingual PDF
Immediate download
165.00 EUR
English/French - Bilingual Hardcopy
in stock
165.00 EUR
Standard number:IEC 60965:2016
Released:2016-02-23
Language:English/French - Bilingual
DESCRIPTION

IEC 60965:2016

IEC 60965:2016 establishes requirements for the Supplementary Control Room provided to enable the operating staff of nuclear power plants to shut down the reactor, where previously operating, and maintain the plant in a safe shut-down state in the event that control of the safety functions can no longer be exercised from the Main Control Room, due to unavailability of the Main Control Room or its facilities. The design has to ensure that the Supplementary Control Room is protected against the hazards, including any localised extreme hazards, leading to the unavailability of the Main Control Room. This new edition includes the following significant technical changes with respect to the previous edition: - requirements associated with regular testing of the supplementary control room (SCR); - requirements to assess the time available during which the reactor will be safe but unattended, in order to move from the main control room (MCR) to the SCR and for the SCR to become operational; - taking into account new requirements laid down by the IAEA.