PRICES include / exclude VAT
Homepage>IEC Standards>IEC 62271-212:2022 - High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV
Sponsored link
download between 0-24 hoursReleased: 2022-06-29
IEC 62271-212:2022 - High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV

IEC 62271-212:2022

High-voltage switchgear and controlgear - Part 212: Compact Equipment Assembly for Distribution Substation (CEADS) for AC voltages up to 52 kV

Appareillage à haute tension - Partie 212: Ensemble compact d’équipement pour poste de distribution (ECEPD) pour les tensions alternatives inférieures ou égales à 52 kV

Format
Availability
Price and currency
English/French - Bilingual PDF
Immediate download
379.50 EUR
English/French - Bilingual Hardcopy
in stock
379.50 EUR
Standard number:IEC 62271-212:2022
Released:2022-06-29
Language:English/French - Bilingual
DESCRIPTION

IEC 62271-212:2022

IEC 62271-212;2022 specifies the service conditions, rated characteristics, general structural requirements and test methods of the assemblies of the main electrical functional units of a high-voltage transformer substation, duly interconnected, for AC voltages up to and including 52 kV on the high-voltage side and service frequency 50 Hz or 60 Hz. The CEADS is cable‑connected to the high-voltage network for indoor and outdoor applications of restricted access. This second edition cancels and replaces the first edition published in 2016. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: - clause numbering aligned with IEC 62271-1:2017, - rewording of title and scope of the document, - implement changes on internal arc definition and testing following the evolution of prefabricated substation concept according to IEC 62271-202, - general review of main test procedures such as temperature rise or dielectric test on interconnections, considering control equipment, communication, smart grid devices and integration of components, - general review of installation, operation, safety and maintenance requirements.