PRICES include / exclude VAT
Homepage>IEC Standards>IEC TR 61000-3-15:2011 - Electromagnetic compatibility (EMC) - Part 3-15: Limits - Assessment of low frequency electromagnetic immunity and emission requirements for dispersed generation systems in LV network
Sponsored link
download between 0-24 hoursReleased: 2011-09-13
IEC TR 61000-3-15:2011 - Electromagnetic compatibility (EMC) - Part 3-15: Limits - Assessment of low frequency electromagnetic immunity and emission requirements for dispersed generation systems in LV network

IEC TR 61000-3-15:2011

Electromagnetic compatibility (EMC) - Part 3-15: Limits - Assessment of low frequency electromagnetic immunity and emission requirements for dispersed generation systems in LV network

Format
Availability
Price and currency
English PDF
Immediate download
308.00 EUR
English Hardcopy
in stock
308.00 EUR
Standard number:IEC TR 61000-3-15:2011
Released:2011-09-13
Language:English
DESCRIPTION

IEC TR 61000-3-15:2011

IEC/TR 61000-3-15:2011(E) is concerned with the critical assessment of existing and emerging national and international standards for single and multi-phase dispersed generation systems up to 75 A per phase, particularly converters connected to the public supply low voltage network. This Technical Report intends to serve as a starting point and to ultimately pave the way for the definition of appropriate EMC requirements and test conditions. This Technical Report is limited to EMC issues (immunity and emission) up to 9 kHz and does not include other aspects of connection of generators to the grid. This Technical Report focuses on emission caused by distributed generation (mainly harmonics and inter-harmonics, DC emissions flicker, rapid voltage changes and fluctuations), as well as immunity aspects to normally occurring events in the public supply network (voltage dips and short interruptions, frequency variations, harmonics and interharmonics). Every effort has been made to utilize already existing emission and immunity standards, including the test set-up and existing test equipment in use.