Don't have a credit card? Never mind we support BANK TRANSFER .

PRICES include / exclude VAT
Homepage>IEC Standards>IEC TS 63189-1:2023 - Virtual power plants - Part 1: Architecture and functional requirements
download between 0-24 hoursReleased: 2023-09-26
IEC TS 63189-1:2023 - Virtual power plants - Part 1: Architecture and functional requirements

IEC TS 63189-1:2023

Virtual power plants - Part 1: Architecture and functional requirements

Format
Availability
Price and currency
English PDF
Immediate download
170.50 EUR
English Hardcopy
in stock
170.50 EUR
Standard number:IEC TS 63189-1:2023
Released:2023-09-26
Language:English
DESCRIPTION

IEC TS 63189-1:2023

IEC TS 63189-1:2023 covers the terms and definitions, system composition and control modes of virtual power plant (VPP). It defines the functional requirements for VPPs, including power generation forecasting, load forecasting, generation and consumption scheduling, control and management of energy storage devices and loads, coordinated optimization of distributed energy resources, status monitoring and communication, data collection and analysis, and market transactions. Since a virtual power plant is a cluster of dispersed energy converting installations, which are aggregated, it uses additional systems to achieve its objectives (e.g. regional energy meteorology forecasting, site specific energy management systems, SCADA and other communication systems). Local regulations, the electricity market model and the corresponding manner of organising the market related to the utilisation of controllable DER affect the management, control and operation of VPPs.