IEEE 1013-2007 - IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stand-Alone Photovoltaic (PV) Systems

IEEE Recommended Practice for Sizing Lead-Acid Batteries for Stand-Alone Photovoltaic (PV) Systems

Format
Availability
Price and currency
English PDF Redline
Immediate download
196.73 EUR
English PDF
Immediate download
143.27 EUR
Standard number:IEEE 1013-2007
Released:20.07.2007
ISBN:978-0-7381-5594-4
Pages:55
Status:Active
Language:English
DESCRIPTION

IEEE 1013-2007

This recommended practice describes a method for sizing both vented and valve-regulated lead-acid batteries in stand-alone PV systems. Installation, maintenance, safety, testing procedures, and consideration of battery types other than lead-acid are beyond the scope of this recommended practice. Sizing batteries for hybrid and grid-connected PV systems is beyond the scope of this recommended practice. Recommended practices for the remainder of the electrical systems associated with standalone PV installations are also beyond the scope of this recommended practice. Sizing examples are given for various representative system applications. Iterative techniques to optimize battery costs, which include consideration of the interrelationship between battery size, PV array size, and weather, are beyond the scope of this recommended practice.

This recommended practice is meant to assist system designers in sizing lead-acid batteries for residential, commercial, and industrial stand-alone PV systems.

Revision Standard - Superseded. A method for determining the energy-capacity requirements (sizing) of both vented and valve-regulated lead-acid batteries used in terrestrial stand-alone photovoltaic (PV) systems is described. Sizing batteries for hybrid or grid-connected PV systems is beyond the scope of this document. Installation, maintenance, safety, testing procedures, and consideration of battery types other than lead-acid are beyond the scope of this document. Recommended practices for the remainder of the electrical systems associated with PV installations are also beyond the scope of this document.