PRICES include / exclude VAT
Homepage>IEEE Standards>27 ENERGY AND HEAT TRANSFER ENGINEERING>27.100 Power stations in general>IEEE 944-1986 - IEEE Recommended Practice for the Application and Testing of Uninterruptible Power Supplies for Power Generating Stations
Sponsored link
Released: 30.06.1986

IEEE 944-1986 - IEEE Recommended Practice for the Application and Testing of Uninterruptible Power Supplies for Power Generating Stations

IEEE Recommended Practice for the Application and Testing of Uninterruptible Power Supplies for Power Generating Stations

Format
Availability
Price and currency
English PDF
Immediate download
143.27 EUR
Withdraw:06.02.2006
Standard number:IEEE 944-1986
Released:30.06.1986
ISBN:978-0-7381-0722-6
Pages:27
Status:Inactive
Language:English
DESCRIPTION

IEEE 944-1986

This recommended practice is intended to define the application and performance requirements for a low-voltage uninterruptible power supply (UPS) system used for service in power generating stations. This recommended practice addresses only requirements for semiconductor ac to ac converter systems (static) with dc electric energy storage capability. This recommended practice is not intended to address other types of UPS systems. This recommended practice is intended to cover application requirements, such as load information and service conditions, performance requirements and design, routine testing requirements for inverters with or without rectifier/chargers, and transfer switches only. The application requirements for batteries and battery chargers are excluded from this recommended practice. They can be found in other documents. This recommended practice is not intended to address equipment or component design requirements, safety-related design criteria, or requirements for equipment qualification and preoperational/surveillance testing.



New IEEE Standard - Inactive-Withdrawn. Withdrawn Standard. Withdrawn Date: Feb 06, 2006. The application and performance requirements for a low-voltage uninterruptible power supply (UPS) system used for service in power generating stations are defined. Service conditions and requirements for design application, procurement documents, and testing are covered. The recommendations apply only to semiconductor ac-to-ac converter systems (static) with dc electric energy storage capability. Equipment or component design requirements, safety-related design criteria, or requirements for equipment qualification and preoperational/surveillance testing are not addressed.