PRICES include / exclude VAT
Homepage>IEEE Standards>33 TELECOMMUNICATIONS. AUDIO AND VIDEO ENGINEERING>33.040 Telecommunication systems>33.040.40 Data communication networks>IEEE C37.242-2021 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control
Sponsored link
Released: 14.10.2021

IEEE C37.242-2021 - IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

Format
Availability
Price and currency
English PDF Redline
Immediate download
149.69 EUR
English PDF
Immediate download
110.13 EUR
English Hardcopy
In stock
136.86 EUR
Standard number:IEEE C37.242-2021
Released:14.10.2021
ISBN:978-1-5044-7504-4
Pages:98
Status:Active
Language:English
DESCRIPTION

IEEE C37.242-2021

This guide provides guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power system protection and control. The following are addressed in this guide: a) Considerations for the installation of PMU devices based on application requirements and typical bus configurations. b) Techniques focusing on the overall accuracy and availability of the time synchronization system. c) Test and calibration procedures for PMUs for laboratory and field applications. d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).

This guide is intended to be used by power system protection professionals for PMU installation and covers the requirements for synchronization of field devices and connection to other devices including PDCs.

Revision Standard - Active. Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) techniques focusing on the overall accuracy and availability of the time synchronization system; (c) test and calibration procedures for PMUs for laboratory and field applications; and (d) communications testing for connecting PMUs to other devices including phasor data concentrators.