Don't have a credit card? Never mind we support BANK TRANSFER .

PRICES include / exclude VAT
Homepage>ISO Standards>ISO 19455-1:2019-Planning for functional performance testing for building commissioning-Part 1: Secondary hydronic pump, system and associated controls
download between 0-24 hoursReleased: 2019
ISO 19455-1:2019-Planning for functional performance testing for building commissioning-Part 1: Secondary hydronic pump, system and associated controls

ISO 19455-1:2019

ISO 19455-1:2019-Planning for functional performance testing for building commissioning-Part 1: Secondary hydronic pump, system and associated controls

Format
Availability
Price and currency
English PDF
Immediate download
127.78 USD
English Hardcopy
In stock
127.78 USD
Standard´s number:ISO 19455-1:2019
Pages:14
Edition:1
Released:2019
Language:English
DESCRIPTION

ISO 19455-1:2019


This document specifies a planning method for functional performance testing (FPT). This document is applicable to the planning of the FPT during the design phase of new buildings and retrofit projects, which is defined in ISO 16813. This document establishes how to design building environmental systems when the FPT is being carried out. This document defines the following: — what kind of information regarding the system is required (for example, design documents, drawings and product specifications); — what kind of data should be measured (though concrete measurement techniques are not specified in this document); — how the measured data is analysed. Such clear definition of the FPT makes it possible for building designers to prepare and plan for FPT throughout the design process. This document specifies an FPT method for secondary hydronic pump, system and associated controls in heating, ventilation and air conditioning (HVAC) systems.