PRICES include / exclude VAT
Homepage>ISO Standards>ISO 4917-6:2024-Design of nuclear power plants against seismic events-Part 6: Post-seismic measures
Sponsored link
download between 0-24 hoursReleased: 2024
ISO 4917-6:2024-Design of nuclear power plants against seismic events-Part 6: Post-seismic measures

ISO 4917-6:2024

ISO 4917-6:2024-Design of nuclear power plants against seismic events-Part 6: Post-seismic measures

Format
Availability
Price and currency
English PDF
Immediate download
115.00 EUR
English Hardcopy
In stock
115.00 EUR
Standard´s number:ISO 4917-6:2024
Pages:12
Edition:1
Released:2024
Language:English
DESCRIPTION

ISO 4917-6:2024


This document applies to nuclear power plants with water cooled reactors. This document does not apply to earthquakes stronger than the design basis earthquake. This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.