Don't have a credit card? Never mind we support BANK TRANSFER .

PRICES include / exclude VAT
Homepage>ISO Standards>IWA 33-3:2021-Technical guidelines for the development of small hydropower plants-Part 3: Design principles and requirements
download between 0-24 hoursReleased: 2021
IWA 33-3:2021-Technical guidelines for the development of small hydropower plants-Part 3: Design principles and requirements

IWA 33-3:2021

IWA 33-3:2021-Technical guidelines for the development of small hydropower plants-Part 3: Design principles and requirements

Format
Availability
Price and currency
English PDF
Immediate download
255.00 EUR
English Hardcopy
In stock
255.00 EUR
Standard´s number:IWA 33-3:2021
Pages:80
Edition:1
Released:2021
Language:English
DESCRIPTION

IWA 33-3:2021


This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments. Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.