PRICES include / exclude VAT
Sponsored link
immediate downloadReleased: 2017-01-31
PD CEN/TS 17006:2016 Earthworks. Continuous Compaction Control (CCC)

PD CEN/TS 17006:2016

Earthworks. Continuous Compaction Control (CCC)

Format
Availability
Price and currency
English Secure PDF
Immediate download
249.60 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
24.96 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
74.88 EUR
English Hardcopy
In stock
249.60 EUR
Standard number:PD CEN/TS 17006:2016
Pages:32
Released:2017-01-31
ISBN:978 0 580 87518 2
Status:Standard
DESCRIPTION

PD CEN/TS 17006:2016


This standard PD CEN/TS 17006:2016 Earthworks. Continuous Compaction Control (CCC) is classified in these ICS categories:
  • 93.020 Earthworks. Excavations. Foundation construction. Underground works

This technical specification provides guidance, specifications and requirements on the use of Continuous Compaction Control (CCC) as a quality control method in earthworks by means of roller integrated dynamic measuring and documentation systems.

The CCC method is suitable for soils, granular materials and rockfill materials which can be compacted using vibratory rollers.

NOTE

A continuous Compaction Control (CCC) technology based on the measure of propel energy necessary to overcome the rolling resistance is also available and can be used as a quality control method in earthworks. The propelling power of the compactor provides an indication of the material stiffness and it is measured as a function of the machine ground speed, slope angle and rolling resistance. This method is not included in this document.