PRICES include / exclude VAT
Homepage>BS Standards>33 TELECOMMUNICATIONS. AUDIO AND VIDEO ENGINEERING>33.200 Telecontrol. Telemetering>PD IEC/TS 61850-80-4:2016 Communication networks and systems for power utility automation Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model
Sponsored link
immediate downloadReleased: 2016-03-31
PD IEC/TS 61850-80-4:2016 Communication networks and systems for power utility automation Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model

PD IEC/TS 61850-80-4:2016

Communication networks and systems for power utility automation Translation from the COSEM object model (IEC 62056) to the IEC 61850 data model

Format
Availability
Price and currency
English Secure PDF
Immediate download
180.00 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
18.00 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
54.00 EUR
English Hardcopy
In stock
180.00 EUR
Standard number:PD IEC/TS 61850-80-4:2016
Pages:22
Released:2016-03-31
ISBN:978 0 580 88992 9
Status:Standard
DESCRIPTION

PD IEC/TS 61850-80-4:2016


This standard PD IEC/TS 61850-80-4:2016 Communication networks and systems for power utility automation is classified in these ICS categories:
  • 33.200 Telecontrol. Telemetering

Included within the IEC 61850 power utility automation architecture are its concepts, data models, communication protocols and the mapping data exchanges on the substation network. This extends beyond just IEDs to other IEC 61850 enabled devices like meters, system applications and remote access gateways.

This part of IEC 61850, which is a technical specification, considers the requirements of power utility automation applications; i.e. the scope is limited by the use cases relevant for meter data exchange in HV/MV substations and MV/LV substations. Only use cases that require the data exchange involving a revenue meter are considered. Applications not covered by the existing standards listed in Clause 2 are out of scope.