PRICES include / exclude VAT
Homepage>BS Standards>03 SOCIOLOGY. SERVICES. COMPANY ORGANIZATION AND MANAGEMENT. ADMINISTRATION. TRANSPORT>03.220 Transport>03.220.01 Transport in general>PD ISO/TR 17427-6:2015 Intelligent transport systems. Cooperative ITS 'Core system' risk assessment methodology
Sponsored link
immediate downloadReleased: 2015-11-30
PD ISO/TR 17427-6:2015 Intelligent transport systems. Cooperative ITS 'Core system' risk assessment methodology

PD ISO/TR 17427-6:2015

Intelligent transport systems. Cooperative ITS 'Core system' risk assessment methodology

Format
Availability
Price and currency
English Secure PDF
Immediate download
292.80 EUR
You can read the standard for 1 hour. More information in the category: E-reading
Reading the standard
for 1 hour
29.28 EUR
You can read the standard for 24 hours. More information in the category: E-reading
Reading the standard
for 24 hours
87.84 EUR
English Hardcopy
In stock
292.80 EUR
Standard number:PD ISO/TR 17427-6:2015
Pages:34
Released:2015-11-30
ISBN:978 0 580 87423 9
Status:Standard
DESCRIPTION

PD ISO/TR 17427-6:2015


This standard PD ISO/TR 17427-6:2015 Intelligent transport systems. Cooperative ITS is classified in these ICS categories:
  • 03.220.01 Transport in general
  • 35.240.60 IT applications in transport and trade

The scope of this Technical Report is to identify critical technical and financial risks that can impact the core system deployment supporting C-ITS vehicle and highway systems service provision and to provide means to evaluate such risks.

This Technical Report is designed to embrace C-ITS vehicle and highway systems where there is some institutional involvement and support, by the direct or indirect provision of core system support, and it is the risks associated with the deployment of ‘Core Systems’ that provide the focus of this Technical Report.

This Technical Report does not provide a calculated ‘global’ risk assessment for C-ITS, but identifies the principal causes of risk, and provides a consistent methodology for a jurisdiction, core system operator, or application service provider, to assess the risks that they face. The objective of this Technical Report is to raise awareness of and consideration of such issues and to give pointers, where appropriate, to standards deliverables existing that provide specifications for all or some of these aspects. This Technical Report does not provide specifications for solutions of these issues.