PRICES include / exclude VAT
Sponsored link
in stockReleased: 2022-07-20
UNE 53929:2022
Plastics. Rehabilitation of supply and sewerage pipes with continuous cured tubes in situ (CIPP). Design, calculation and installation
Plásticos. Rehabilitación de conducciones de abastecimiento y alcantarillado con tubos continuos curados in situ (CIPP). Diseño, cálculo e instalación.
Format
Availability
Price and currency
Spanish PDF
Immediate download
102.30 EUR
Spanish Hardcopy
In stock
102.30 EUR
Standard number: | UNE 53929:2022 |
Pages: | 52 |
Released: | 2022-07-20 |
Status: | Standard |
DESCRIPTION
This standard UNE 53929:2022 Plastics. Rehabilitation of supply and sewerage pipes with continuous cured tubes in situ (CIPP). Design, calculation and installation is classified in these ICS categories:
- 23.040.20
- 23.040.01
- 23.040.03
- 23.040.05
- 23.040.10
- 23.040.50
Categories:
UNE standards
23.040.01 Pipeline components and pipelines in general
23.040.03 Pipelines and its parts for external water conveyance systems
23.040.05 Pipelines and its parts for external sewage systems
23.040.10 Iron and steel pipes
23.040.50 Pipes and fittings of other materials
23.040.20 Plastics pipes
UNE standards
23.040.01 Pipeline components and pipelines in general
23.040.03 Pipelines and its parts for external water conveyance systems
23.040.05 Pipelines and its parts for external sewage systems
23.040.10 Iron and steel pipes
23.040.50 Pipes and fittings of other materials
23.040.20 Plastics pipes