VDA 2
Quality Assurance for Supplies Production process an product approval PPA
Sicherung der Qualität von Lieferungen Produktionsprozess- und Produktfreigabe PPF
Released: | 2020 |
Standard number: | VDA 2 |
Edition: | 6th |
Pages: | 88 |
Format: | Hardcopy |
VDA 2 : 2020
Quality Assurance for Supplies
VDA 2 is include these .xls and .xlsm tables (will be e-mailed)
PPA Agreement
Self-assessment product
Self-assessment production proces
Cover sheet PPA report
PPA evaluation
Product-related deliverables
Productionprocess-related and general deliverables
6.1 Cover sheet for PPA software
Part History
Appendix 8 Trigger Matrix final
Description for VDA 2:
With the publication of this 6th edition the PPA Process has been completely restructured in order to describe the requirements relating to new or modified deliveries from external sources and those produced within the company.
The area of application is defined more clearly, taking into consideration existing VDA publications and terms. As an aid in implementing the stipulations in this present publication a sequence diagram for PPA is included, as well as the "trigger matrix" for changes which must be declared.
To improve understanding, the requirements relating to submission level have been stated more precisely. A significant up-date covering process validation has also been introduced, together with submission level "0". All the changes which have been made are taken into account in the completely revised form for production process and product approval in accordance with VDA volume 2.
Contents
Preamble
1 Introduction
1.1 Production process and product approval (PPA) – process
1.2 Production process and product approval (PPA) – objective
2 Range of Application
3 Initiation for a PPA Process
4 The PPA Process in principle (sampling)
5 Planning and agreeing the PPA Process
6 Selecting submission level
6.1 PPA Process
6.2 Performance test / process validation
6.3 PPA documentation
6.4 Sample submission and customer's decision on approval
for production shipment authorization
6.5 Special procedures
7 Archiving periods
8 Declaration of constituent materials
9 Technical terms and abbreviations
10 Appendix documents
10.1 Downloads
APPENDIX 1: HOW TO USE THE TRIGGER MATRIX
Appendix 2: Trigger matrix
Appendix 3: Form for a PPA Process planning
Appendix 4: Matrix for assessing the serial production maturity of
product and process
Appendix 5: PPA form
Appendix 6: Software test report
Appendix 7: Comparison between PPA and PPAP
Here You will find all others VDA standards and volumes.
VDA 2 and other VDA Standards are not available in PDF format
Product Audit
Process Audit
Documented Information and Retention
Quality Assurance in the Process Landscape: sections 1-4: General, risk analyses, methods, process models